LHP LHP ERPPresenter guide
Design system Start demo

Presenter guide

Everything you need to walk the partners through LHP ERP in 20–30 minutes — where to start, what to click and what to say.

Demo “today” is Friday 2 October 2026, 10:30 AM Dubai Signed in as Managing Partner 130+ screens · 2 companies + group
Before you present: open the demo in Chrome or Safari. Show partner screens on a laptop, and the site-foreman and factory-floor screens on a phone (or a browser window about 390 px wide) — they are designed for phones first. No internet is needed.

Start here

Three screens that set the scene in the first two minutes

Numbers worth remembering

The same figures appear on every screen — quote them with confidence
Group cashAED 497,100free after 30 days: 93,919
TS free cashAED 30,019of 312,600 · 90.4% committed
Approvals waiting12TS 8 · M&G 4
Hero projectTS-26-01462% done vs 66% plan
Factory launch1 Nov 2026licence 5 of 9 steps
Key story: PR-TS-26-0142 (AED 38,450 of glass from our own factory) needs your approval today, or the Bay View Tower handover slips from 30 Oct to 3 Nov.

Ten walkthroughs

Each one tells a short business story from start to finish. Pick the ones that matter to your audience.

≈ 3 min each
1Lead → quotation → won → project code → schedule → shareSales & projects

How a WhatsApp enquiry becomes a coded project with a schedule the client can see — without re-typing anything.

  1. 1
    13 open opportunities, AED 2.39M, weighted 905,230. Open the hot Meridian card.
  2. 2
    Negotiation at 60%, Rev 2 at 465,000, decision 10 Oct — every call and revision logged.
  3. 3
    Printable A4 quote with BOQ and VAT. Click “Convert to project”.
  4. 4
    Code generated automatically; budget from the estimate; schedule from the “Office Fit-out (Standard)” template.
  5. 5
    New row and confirmation — schedule shared with the team.
  6. 6
    Plan vs actual per activity, red today line, glass at risk.
  7. 7
    Read-only link on WhatsApp or email — costs and internal notes are never shown.
2Site progress with photos, from the foreman's phoneSite

Show on a phone. The foreman updates progress with photos; the schedule and the client view update by themselves.

  1. 1
    GPS check-in, crew 7/7, big buttons for daily report, purchases, bills and photos.
  2. 2
    Photos are required for this activity; the camera opens straight away. Tap “Save update”.
  3. 3
    Flooring bar moves to 70% and the client view refreshes.
3Purchase request → both partners approve → LPO → factory orderApprovals

The heart of the demo: control over spending, with an automatic inter-company order to LHP Metals & Glass.

  1. 1
    Ramesh Thapa asks for AED 1,514 of silicone and fixings; budget check and approval route shown before he submits.
  2. 2
    PR-TS-26-0145 waits for one partner; both partners get it on WhatsApp.
  3. 3
    Over 5,000, so both partners sign. The Investor Partner approved last night; you are next.
  4. 4
    LPO-TS-26-121 created and sent; tempering slot on 5 Oct held at the factory.
  5. 5
    A4 purchase order with both digital approvals, ready to print or send.
  6. 6
    SO-MG-26-025 appears in the factory automatically — no phone calls, no re-typing.
4Emergency cash purchase with a photo of the billPetty cash

Site ran out of tape. The foreman pays cash, snaps the bill, and the amount, VAT and TRN are read from the photo.

  1. 1
    Camera opens; shop, date, amount 64.50 and VAT 3.07 are filled in; float balance shown after the purchase.
  2. 2
    PC-TS-26-0232 waits for the PM; float cards show who holds how much.
5Supplier bill → approval → paymentPayments

The bill is matched to the order and the delivery before anyone pays — then paid by bank transfer with an OTP.

  1. 1
    3-way match: LPO ↔ goods received ↔ invoice. AED 24,780 needs one partner.
  2. 2
    Status changes to Approved, with a “Pay now” next step.
  3. 3
    Bank transfer (≈ AED 1–5) vs gateway (2%, AED 495.60) — the system recommends the cheaper option.
  4. 4
    Bill closed, ledger posted, remittance sent to the supplier on email and WhatsApp.
6Progress invoice → collection → retentionBilling

Monthly billing (IPA) with advance recovery and retention calculated for you, as a proper UAE tax invoice.

  1. 1
    Contract 404,600 incl. VO-02; billed, received, retention held 11,545, advance still to recover.
  2. 2
    This period 96,500 − advance 9,650 − retention 4,825 + VAT = 86,126.25.
  3. 3
    INV-TS-26-0093 sent; overdue invoices have a one-tap reminder.
  4. 4
    A4 layout with TRNs, bank details and e-invoice readiness; record the payment when it arrives.
7Cash visibility & monthly reportCash

The question the partners ask most: how much money do we really have? Answer: AED 30,019 free, not 312,600.

  1. 1
    Bank minus salaries, rent, bills and VAT already due; 13-week forecast shows December dipping below one month of overhead.
  2. 2
    Income by source, operational vs project costs, risks and what to do next month.
  3. 3
    Daily summary at 9:00 PM, approvals with buttons, monthly PDF.
8HR: employee file, documents, insurance and leave lettersPeople

One complete file per employee — visa, Emirates ID, insurance, leave history with return dates — and expiry alerts before fines happen.

  1. 1
    24 staff by department, visa and insurance expiry badges.
  2. 2
    Tabs for documents, insurance, leave out/back dates, salary & WPS, assets issued.
  3. 3
    Leave letter upload is required; balance after leave and approval route shown.
  4. 4
    New request in the queue, October calendar, UAE leave rules.
  5. 5
    1 expired and 5 expiring within 30 days — start renewals in one tap.
9Factory: order → job card → floor → QC → dispatch → licenceMetals & Glass

The new factory in teal: every order tracked through cutting, tempering and QC to delivery — and the licence countdown to 1 November.

  1. 1
    Glass cut today, yield 88%, machines, low 12 mm stock, launch ribbon.
  2. 2
    Inter-company shopfront order for TS-26-017, delivery 9 Oct.
  3. 3
    Cutting list, sheet yield, outsourced tempering, job cost AED 3,288.
  4. 4
    Show on a phone: start a stage, report breakage, log a machine problem.
  5. 5
    Pass rate 96.2%, open NCRs, tempering certificates.
  6. 6
    Truck and A-frame plan, delivery notes with proof of delivery.
  7. 7
    5 of 9 steps done; Civil Defence inspection 8 Oct; launch 1 Nov.
10Partner control: approvals, users, rules, audit, assistantGroup

How the partners stay in control of both companies without being in the office.

  1. 1
    12 items across both companies; approve 5 small items in one tap.
  2. 2
    16 users, who can see and approve what, in which company.
  3. 3
    Amount limits per company; rule changes need both partners. Try “Add rule”.
  4. 4
    Every approval, payment and change with before → after, device and place. Show the blocked sign-in.
  5. 5
    “How much free cash do we have?” — answers with sources, limited to what your role may see.

Every screen, by module

Use this as a jump list when someone asks “can it do …?”

Sign-in & partners

Group view · indigo · 13 screens

Overview, sales & CRM

Technical Services · 11 screens

Procurement & stores

Technical Services · 11 screens

Projects & site

Technical Services · 18 screens

Finance

Technical Services · 15 screens

People & HR

Technical Services · 15 screens

Suppliers & subcontractors

Technical Services · 10 screens

Assets, vehicles & settings

Technical Services · 8 screens

Factory & sales

Metals & Glass · 8 screens

Production & quality

Metals & Glass · 6 screens

Stores, purchasing & dispatch

Metals & Glass · 7 screens

Finance, people & admin

Metals & Glass · 9 screens

What is real in this demo

Shown exactly as the finished product will work
  • Screens, layouts and flows
    Every page, button and step is the proposed design
  • Consistent, realistic numbers
    Totals, VAT, retention and cash figures add up across all screens
  • Mobile-first design
    Same screens adapt from phone to desktop
  • Business rules
    Approval limits, maker-checker, UAE VAT, WPS, leave rules

What is simulated

An HTML & CSS prototype — nothing is saved
  • Actions show a prepared result
    Approve, submit or send jumps to the “after” state of the page; data does not change
  • Search boxes and some filters
    Filter chips work; free-text search and date pickers are visual only
  • WhatsApp, AI assistant, bank and OCR
    Shown as realistic previews; connected in the real build
  • Sign-in and permissions
    Any role can be opened from the sign-in page; no password check

Presenting tips

Small things that make the demo feel smooth
Reset a page

After an action the address ends with something like #approved. Press Back, or delete that part of the address, to see the page before the action.

Print documents

Invoices, LPOs, quotations, payslips and delivery notes print as clean A4 pages with Ctrl/Cmd + P — the menus are hidden automatically.

Switch companies

Use the company name at the top of the menu. Blue is Technical Services, teal is Metals & Glass, indigo is the partners' Group view.

For the development team: components, colours and CSS-only patterns are documented in the design system.Design system