Official launch 1 Nov 2026 · licence at step 5 of 9
Good morning, Partner
LHP Metals & Glass · Friday, 2 October 2026 · Shift 7:00 AM – 4:00 PM · 13 of 14 staff checked in
PR-MG-26-0031 needs your approval — AED 22,600 for 40 sheets of 12 mm clear glass.
Only 9 sheets are left (reorder level 20) and the TS glass order PR-TS-26-0142 needs about 14. The Metal Division Partner has approved; approve today for delivery on 4 Oct.
MC-05 corner crimping machine is back in service after 3.5 h. Breakdown on 1 Oct (blade alignment), fixed the same afternoon — no order delayed. Machine log
Orders in hand
AED129,800
5 open orders · 2 deliveries booked in the next 7 days
+38,450 from TSawaiting approval
Glass cut today
64.2 m²
Target 90 m² · edged 118 rm · aluminium 46 bars
Glass yield
88%
3 ptsabove the 85% target
Remnant rack 23 pieces · 31.4 m² to reuse
On-time delivery
91%
September · target 95%
Last drop on time30 Sep
Cash in bank
AED184,500
AED 63,900 free after 30-day commitments
September result
AED−28,100
Sales 98,900 · Expenses 127,000
Pre-launch ramp-up
Production board
8 job cards · 6 in progress · last update 10:28 AM from the shop floorPlanned21 on hold for advance
Cutting1Remake next on MC-01
Edging & drilling1Window glass on MC-02
Outsourced2Tempering · powder coating
Assembly114 sliding windows, 60%
Quality check12 panels to remake
Ready to dispatch0Next truck Mon 5 Oct
Dispatched this week118 windows, Blue Wave
Jobs on the floor today
Shop-floor app-
JC-26-0451 · Shopfront glass 12 mm, 6 piecesTemperingback 6 Oct
-
JC-26-0447-R1 · Remake 2 shower panels 8 mmCutting nextMC-01
-
JC-26-0449 · Window glass batch 2, 28 panes 6 mmEdging 69%MC-02
-
JC-26-0440 · Sliding windows batch 2, 14 unitsAssembly 60%3 fabricators
-
JC-26-0447 · 14 shower enclosures 8 mmQCAli Raza
-
JC-26-0452 · Door frame & shopfront sectionsCoatingback 5 Oct
Next week depends on 12 mm glass arriving and Gulf Tempered slots on 5 & 8 Oct.
Capacity plan
Machines
8 running · 1 idle · uptime this week 94%- RunningMC-01 · Glass cutting table
- PM due 5 OctMC-02 · Straight-line edger
- IdleMC-03 · Glass drilling
- RunningMC-04 · Aluminium double saw
- RunningMC-05 · Corner crimper
- RunningMC-06 · Copy router
- RunningMC-07 · MIG/TIG welding set
- RunningMC-08 · Air compressor 10 HP
- RunningMC-09 · Forklift 3 t (diesel)
Operators report breakdowns from the floor app.
Log breakdown
Quality
Ali Raza · 3 inspections today96%
96.2% passed first time
September · target 95% · 2 remakes this month
Low stock
2 items below reorder level · raw materials AED 84,725Clear float glass 12 mmPR-MG-26-0031 waiting for you
9 / 20
9 sheets on hand vs reorder level 20. TS order PR-TS-26-0142 alone needs ≈ 14 sheets — 40 sheets are on order once approved.
Extra-clear (low-iron) 12 mmAdd to next order
4 / 6
Used for premium shower screens. Suggested top-up: 10 sheets (AED 8,200) with the next Gulf Float Glass order.
Remnant rack: 23 pieces · 31.4 m² — the cutting optimiser uses these first.
Dispatch this week
Isuzu NPR 3-ton with glass A-frame · Dubai L 38821-
DN-MG-26-0042 · Cedar InteriorsMon 5 OctAED 28,700
-
DN-MG-26-0043 · LHP TS site, Oasis Walk G-24Fri 9 OctAED 26,800
-
DN-MG-26-0041 · Blue Wave ContractingDelivered 30 Sep18 of 32
Glass A-frames: 9 in the yard · 3 at customer sites to collect
Delivery note
September sales
AED 98,900 invoiced · 40% to LHP Technical ServicesExternal customers · 58,900 (60%)Inter-company (LHP TS) · 40,000 (40%)
To collect96,150LHP TS 42,000 due 14 Oct
To pay suppliers56,700incl. job-work 8,400
Collections, 30 days126,2854 receipts expected
Partners' capital450,000injected Jul – Sep
What the factory needs to break even
Fixed costs run at about AED 78k a month. At a 48% contribution margin the factory breaks even at roughly AED 160k of sales a month — September was AED 98,900, so external orders must grow after the 1 Nov launch.
Factory licence
IND-2026-04417 · target issue 28 OctLicence progress
Step 5 of 9
4 done1 in progress4 to go
- Municipality approval
- Civil Defence fire-safety inspection
- Environmental NOC
- Partners' documents & signatures
- Industrial licence issued
Next: Civil Defence on Thu 8 Oct
Prepare