LHPMetals & Glass
6
Sales orders
Inter-company · from LHP Technical Services LPO-TS-26-118 for TS-26-017

SO-MG-26-021 In production

Shopfront glass & aluminium entrance door frame · Unit G-24, Oasis Walk, Al Barsha

TSLHP Technical Services Ordered 24 Sep 2026 Delivery Fri 9 Oct AED 26,800 + VAT
  1. Order24 Sep
  2. Drawing approved26 Sep
  3. 3Productionsince 29 Sep
  4. 4QC6 Oct
  5. 5Dispatch9 Oct
  6. 6Delivered9 Oct
  7. 7Invoicedon delivery
  8. 8Paiddue 8 Nov
On track for Friday 9 Oct. The glass is at Gulf Tempered Glass (back Tue 6 Oct) and the door frame sections are at ColorShield for RAL 9005 coating (back Mon 5 Oct). Ramesh Thapa confirmed on 1 Oct that the TS site can receive the shopfront.

Order items

Inter-company prices · M&G list price −8%
ItemQtyRate (AED)Amount (AED)
12 mm clear tempered glass panels, flat-polished edges5 pieces · 4 × 1,000 × 2,500 + 1 × 880 × 2,500 · per SD-SF-02 Rev B12.2 m²285.003,477.00
12 mm clear tempered door leaf 1,000 × 2,400Drilled for patch fittings & lock · 4 holes2.4 m²285.00684.00
Aluminium entrance door frame & shopfront sectionsHead, sill, mullions & transom · powder-coated RAL 9005 black1 set17,820.0017,820.00
Door hardware setFloor spring EN3, SS 304 patch fittings, lock & 1,200 mm pull handle1 set3,860.003,860.00
Accessories, packing & deliveryStructural silicone, EPDM gaskets, fixings · A-frame delivery to Oasis Walk1 lot959.00959.00

List price value AED 29,130 less inter-company discount 8% (AED 2,330), as approved by the partners on 1 Sep. The same prices show on the TS side, so no one needs to check them again.

Subtotal26,800.00
VAT 5%1,340.00
TotalAED 28,140.00

Job cards

2 job cards · both at outside partners today
Board

Delivery

DN-MG-26-0043 is drafted and ready to print on the day
Delivery note
Deliver to
Unit G-24, Oasis Walk, Al Barsha
TS-26-017 · Urban Threads store fit-out
Date & slot
Fri 9 Oct · 8:30 AM
Loading bay B · mall gate pass · loads at Plot 27 at 7:30 AM
Site contact
RT
Ramesh Thapa
TS Site Foreman
Truck & driver
Isuzu NPR 3-ton with A-frame · Dubai L 38821
Suresh Bahadur
Handling
2 helpers + 4-cup suction lifters
Largest piece 2.5 m² · about 75 kg
Returnable
Glass A-frame #3 — collect after unloading
Mall delivery permit is booked by TS. M&G installs nothing — the TS crew fixes on site.

Documents

4 files · 1 expected

Customer

Group company · inter-company terms
Company
LHP Technical Services LLC
TRN 100 4567 8912 3003
Project
TS-26-017 · Retail fit-out, Unit G-24 Oasis Walk
End client Urban Threads Trading LLC
Customer order
LPO-TS-26-118 · 24 Sep
From PR-TS-26-0139, approved by both TS partners
Payment terms
30 days from delivery
Same order on the TS sideTS purchase orders

Invoice plan

One invoice on delivery
Order value26,800.00
VAT 5%1,340.00
Invoice on 9 OctAED 28,140.00

Due 8 Nov. When M&G invoices, the matching supplier bill appears in TS automatically and both sides reconcile.

Eliminated in group reportsInter-company

Glass pieces

6 pieces · 12 mm clear · 14.6 m²
Cutting list
  • FP-1
    Fixed panel 1,000 × 2,500
    2.50 m²
  • FP-2
    Fixed panel 1,000 × 2,500
    4 holes
    2.50 m²
  • FP-3
    Fixed panel 1,000 × 2,500
    4 holes
    2.50 m²
  • FP-4
    Fixed panel 1,000 × 2,500
    2.50 m²
  • FP-5
    Return panel 880 × 2,500
    2.20 m²
  • DL-1
    Door leaf 1,000 × 2,400
    4 holes · patch fittings & lock
    2.40 m²
Edges flat-polished · 12 holesSD-SF-02 Rev B

Activity

Newest first
  1. Delivery slot sent to Ramesh Thapa
    2 Oct, 10:41 AM · WhatsApp · Fri 9 Oct, 8:30 AM
  2. Glass sent for tempering · JW-MG-26-009
    1 Oct, 9:30 AM · Gulf Tempered Glass · ETA 6 Oct
  3. Frame sections to ColorShield for RAL 9005
    30 Sep · JC-26-0452 · JW-MG-26-010 · back 5 Oct
  4. Glass cut, edged & drilled
    29 – 30 Sep · JC-26-0451 · yield 89%
  5. Shop drawing SD-SF-02 Rev B approved by TS
    26 Sep, 2:15 PM · Arun Kumar
  6. Site measurement at G-24
    25 Sep · Imran Sheikh with Ramesh Thapa
  7. Order created from LPO-TS-26-118
    24 Sep, 3:10 PM · automatic, inter-company
TS site notified — delivery Fri 9 Oct, 8:30 AM
Ramesh Thapa has the slot, the pieces list and the truck details on WhatsApp. The TS-26-017 schedule shows the delivery.